Zhuoer Enterprise Community-Civil-Military Integration Industry Demonstration Park 2.1,2.2, Phase 2.3 19800kVA Comprehensive Power Distribution Project

The total construction area of the project is 320000 m2The installed capacity of this project is 19800kVA, which consists of 1 center with 2 distribution power rooms. The project signed a strong power general contractor construction contract with our company in August 2022. The 2.1 phase of the project has completed power transmission and delivered for use. The 2.2 phase will be powered on December 30, 2022, and the 2.3 phase will be powered on in April 2023.

 

 

 

 

Business Cooperation

Photovoltaic Wind power Charging pile energy storage
Wind power

Wind power

Wind power generation is a renewable energy generation method that uses the power of wind to convert wind energy into electrical energy. Wind power generation uses wind turbines (also known as wind turbines or wind turbines) to convert wind energy into mechanical energy, and then converts the mechanical energy into electrical energy through generators. Wind power has the advantages of no pollution, no emissions, renewable, wind power project construction is divided into centralized wind power, distributed wind power.

Learn more
Charging pile

Charging pile

Hengkai electrical charging pile mainly relies on China Tower's mature power security operation experience, professional maintenance capabilities and visual, manageable and controllable intelligent monitoring platform. In the construction of automobile charging stations in all cities, counties and districts of the province, the two major models of "self-built, self-operated, co-operated" can be adopted to provide customers such as new energy buses, online car-hailing, taxis, logistics vehicles, and official vehicles. Fast charging service.

Learn more
Energy storage

Energy storage

Flexible matching module design to cope with different power demand

Learn more